Show More Ask Question

1 Answer

Answer :

Generators for peak load plants are usually designed for maximum efficiency at 50 to 75 percent full load.

Like 0 like
Next Page →

Related

Answer : D.C. generators are normally designed for maximum efficiency around full-load.

Description : State why nuclear power plants are used as base load plants and diesel power plants as a peak load plant. 

Answer : 1. Because of following points Nuclear power plant used as base load power plant:-  1. Nuclear power plants is very economical for producing bulk amount of electric power 2. Nuclear power plant is reliable ... . The plants can be put on load easily. 4. Diesel engines take less time to make OFF.

Description : What is base load and peak load power plants?

Description : For a transformer, operating at constant load current, maximum efficiency will occur at?

Answer : For a transformer, operating at constant load current, maximum efficiency will occur at unity power factor.

Answer : An ideal transformer will have maximum efficiency at a load such that copper loss equal to iron loss.