Generating capacity connected to the bus bars and ready to take load when switched on is known as spinning reserve.

Like 0 like
Next Page →

Related

Description : In a lamp load when more than one lamp are switched on the total resistance of the load?

Answer : In a lamp load when more than one lamp are switched on the total resistance of the load decreases.

Description : Sparking occurs when a load is switched off because the circuit has high?

Answer : Sparking occurs when a load is switched off because the circuit has high inductance.

Description : In load flow Study, a PV bus is treated as a PQ bus when

Answer : Voltage at the bus becomes high 

Description : Power station having Load factor = 70%, capacity factor = 50%, used factor = 60%, maximum demand = 20MW then annual energy production is  (1) 122.8 GWh (2) 198.55 GWh (3) 128.2 GWh (4) 188.82 GWh

Answer : Power station having Load factor = 70%, capacity factor = 50%, used factor = 60%, maximum demand = 20MW then annual energy production is 122.8 GWh

Description : The problematic pollutants in emission of coal based generating plants __________.  (A) SO₂ (B) NOx (C) CO (D) All of the above

Answer : The problematic pollutants in emission of coal based generating plants __________.  (A) SO₂ (B) NOx (C) CO (D) All of the above