Demand factor is defined as maximum demand/connected load.

Like 0 like

Related Questions

164 views

Last Answer : Load factor of a power station is defined as average load/maximum demand.

1 answer
146 views

Last Answer : In a power plant if the maximum demand on the plant is equal to the plant capacity, then plant reserve capacity will be zero.

1 answer
83 views

Last Answer : Maximum demand on a power plant is the greatest of all "short time interval averaged" demand during a period.

1 answer
66 views

Last Answer : In Hopknison demand rate or two part tariff the demand rate or fixed charges are dependent upon the maximum demand of the consumer.

1 answer
88 views

Last Answer : Approximate estimation of power demand can be made by load survey method, statistical methods, mathematical method, economic parameters.

1 answer
104 views

Description : In order to have a lower cost of electrical energy generation the load factor  (1) and the diversity factor should be low (2) should be low but the diversity factor should be high (3) should be high but the diversity factor should be low (4) and the diversity factor both should be high

Last Answer : In order to have a lower cost of electrical energy generation the load factor and the diversity factor both should be high

1 answer
71 views

Last Answer : An induction motor has relatively high power factor at near full load.

1 answer
130 views

Last Answer : In a distribution system, in order to improve power factor, the synchronous capacitors are installed at the receiving end.

1 answer
158 views

Last Answer : For a consumer the most economical power factor is generally 0.95 lagging .

1 answer
108 views

Last Answer : In an interconnected system, the diversity factor of the whole system increases.