Demand factor is defined as maximum demand/connected load.

Like 0 like
Next Page →

Related

Answer : Load factor of a power station is defined as average load/maximum demand.

Answer : Power plant having maximum demand more than the installed rated capacity will have utilisation factor more than unity.

Answer : In a power plant if the maximum demand on the plant is equal to the plant capacity, then plant reserve capacity will be zero.

Answer : Maximum demand on a power plant is the greatest of all "short time interval averaged" demand during a period.