Load factor of a power station is generally less than unity.

Like 0 like

Related Questions

162 views

Last Answer : Load factor of a power station is defined as average load/maximum demand.

1 answer
101 views

Description : Power station having Load factor = 70%, capacity factor = 50%, used factor = 60%, maximum demand = 20MW then annual energy production is  (1) 122.8 GWh (2) 198.55 GWh (3) 128.2 GWh (4) 188.82 GWh

Last Answer : Power station having Load factor = 70%, capacity factor = 50%, used factor = 60%, maximum demand = 20MW then annual energy production is 122.8 GWh

1 answer
126 views

Last Answer : For high value of diversity factor, a power station of given installed capacity will be in a position to supply more number of consumers.

1 answer
2,163 views

Description : A transformer has negative voltage regulation when its load power factor is   (1) Zero (2) Unity (3) Leading (4) Lagging

Last Answer : Leading

2 answers
253 views

Description : In a synchronous generator delivering lagging power factor load  (1) the excitation emf leads terminal voltage by the power angle (2) the excitation emf lags terminal voltage by the power angle (3) ... by the power factor angle (4) excitation emf lags the terminal voltage by the power factor angle

Last Answer : In a synchronous generator delivering lagging power factor load the excitation emf leads terminal voltage by the power angle

1 answer