198 views

Please log in or register to answer this question.

1 Answer

Answer :

Overhead system can be designed for operation up to 400 kV.

Like 0 like

Related Questions

624 views

Description : What would happen if a power transformer designed for operation on 50 Hz (frequency) were connected to a 500 Hz (frequency) source of the same voltage:  (A) Eddy Current and Hysteresis losses will be ... Current will be too much high  (C) Transformer may start to smoke and burn  (D) No effect

Last Answer : What would happen if a power transformer designed for operation on 50 Hz (frequency) were connected to a 500 Hz (frequency) source of the same voltage:  (A) Eddy Current and Hysteresis losses will be ... will be too much high  (C) Transformer may start to smoke and burn  (D) No effect

1 answer
2,712 views

Description : Why ACSR conductor is used for overhead lines?

Last Answer : It has high tensile strength 

1 answer
72 views

Description : Draw and explain integrated duration curve used in system operation. 

Last Answer : Diagram of integrated duration curve used in system operation: Explanation:  Integrated duration curve is obtained from load duration curve. It is drawn in between load on Y-axis in KW/MW and the X- ... a particular time of a day can also be shown on a curve which is called as mass curve. 

1 answer
98 views

Last Answer : Relays can be designed to respond to changes in resistance, reactance or impedance voltage and current, light intensity, temperature.

1 answer
Show MoreAsk QuestionNext Page →