1 Answer

Answer :

A design metric is a measure of a implementations features such as cost, size, performance and power.

Commonly used design metrics are:

1.NRE cost:

NRE stands for non recurring engineering cost. The one time monetary cost of Designing the system once the system is designed, any number of units can be manufactured without incurring any additional design cost . Hence the term non recurring.

2.Unit cost:

The monetary cost of manufacturing is copy of the system, excluding NRE cost.

3.Size:

The physical space required by the system. It is often measured in bytes for software and Gates or transistor for Hardware.

4.Performance:

The performance is the execution time of the system.

5.Power:

The amount of power consumed by the system, which may determine the lifetime of a battery or quilling requirements of the IC, since more power means more heat.

6.Flexibility:

The ability to change the functionality of the system without incurring heavy NRE cost.

7. Time to prototype:

The time needed to build a working version of the system, which may be bigger or more expensive than the final system implementation but it can be used to verify the system usefulness and correctness and to refine the systems functionality.

8.Time to market:

The time required to develop a system to the point that it can be release and sold to customers. The main contributors are designed time, manufacturing time, and testing time.

9.Maintainability:

The ability to modify the system after its initial release, especially by designers who did not originally designed the system.

10.Correctness:

It's our confidence that we have implemented the systems functionality correctly. We can check the functionality throughout the process of Designing the system, and we can insert test circuitry to check that manufacturing was correct.

11.Safety:

The probability that the system will not cause harm.

Like 0 like

Related Questions

Description : a) Time to market b) The performance

Last Answer : a) Time to market :Time to market is the time from development of an embedded system to sell it to customers is called time to market. For more profit, the time to market should be ... losses due to delayed entry.b) Performance :Latency and throughput are the two main measures of performance.

Description : Differentiate general purpose processor, single purpose processor and ASIC with respect to design matrix, with suitable example.

Last Answer : General purpose processorGeneral purpose processor is a Programmable device.General purpose processor used in microprocessor.General purpose processor have general data path with large register ... Examples of application specific processor are embedded microcontroller, network processor and DSP.

Description : What is watchdog timer ? Explain the implementation of time out for ATM with block diagram and program.

Last Answer : A special type of timer is a watchdog timer, which will reset the system after a predefined timeout. Watchdog timer reset timer every X time unit, else timer generates a signal ... be loaded into timereg. This is to prevent erroneous software from unintentionally resetting the watchdog timer.

Description : Evaluating testability of the requirements and system are a part of which phase:- a) Test Analysis and Design b) Test Planning and control c) Test Implementation and execution d) Evaluating ... text box which accepts alphabets in lower or upper case. Identify the invalid Equivalence class value.

Last Answer : a) Test Analysis and Design

Description : State True or False. i) Master Development Plan basically is a schedule of various applications to be comprised. ii) It consists of start and finish dates of a system analysis, design implementation and maintenance activities. ... B) i-False, ii-True C) i-True, ii-False D) i-False, ii-False

Last Answer : A) i-True, ii-True

Last Answer : Various features of Linux that are used in embedded systems are as follows : Linux is multiuser operating system. Linux is open source and free. Linux can be ... Linux supports handling of errors. Real-time Linux supports the group scheduling functions.

Description : Explain the need to consider following factors in design matrix of embedded system: (i) Processor (ii) Memory (iii) Power (iv) Non- recurring engineering cost.

Last Answer : 1. Processor: Selection of processor depends upon amount of processing power and the register width required. Powerful 8bit, 16 bit, 32 bit & 64bit processors are available. The clock speed ... system is designed any number of units can be manufactured without incurring any additional design cost.

Description : Defects are least costly to correct at what stage of the development cycle? A. Requirements B. Analysis & Design C. Construction D. Implementation

Last Answer : A. Requirements

Description : The statement the study, design, development, implementation, support or management of computer-based information systems, particularly software applications and computer Hardware refers to (A) Information ... ICT) (C) Information and Data Technology (IDT) (D) Artificial Intelligence (AI)

Last Answer : (A) Information Technology (IT)

Description : Sketch internal design of 4x3 ROM.

Last Answer : The internal design of 4x3 ROM

Description : Describe different RT level computational and sequential components used to design single function processors.

Last Answer : RT-level combinational components:- To reduce the complexity in digital logic, combinational components are used, which are more powerful than logic gates.  Such combinational ... during a clock edge. An asynchronous inputs value effects the circuit independent of the clock.

Description : What is design technology? Explain top down design process.

Last Answer : Design technology: Design technology is the manner in which we convert our concept desired system into an implementation. The three main design technologies are 1. Compilation/Synthesis ... general purpose processors and A Gate-level Netlist for special-purpose processors.

Description : Could you please list down some of common task used during implementation

Last Answer : Here are few basic and frequently used task 1. Manage Enterprise HCM Information 2. Manage Legal Entity HCM Information 3. Manage Legal Addresses 4. Manage Legal Entity 5. Manage Location ... Lookups 20. Manage Goal Management Notification Settings P.S. Task names are not case-sensitive

Description : Consider an implementation of unsorted single linked list. Suppose it has its representation with a head and a tail pointer (i.e. pointers to the first and last nodes of the linked list). Given the ... the front node of the linked list. (D) Deletion of the last node of the linked list.

Last Answer : (D) Deletion of the last node of the linked list. 

Description : List and describe three general approaches to improve designer productivity.

Last Answer : Automation: The task of using a computer program to replace manual design effort. The program replaces manual design effort. Synthesis. Reuse: The ... correctness/completeness of each design step. Hardware/software co-simulation.

Description : List and explain the various functions supported by Linux/RTLinux.

Last Answer : Various functions of RTLinux is as follows: Interrupt handling functions

Description : List five system design parameters considered when system designers choose the system operational wavelength and link components.

Last Answer : Launch power, connection losses, bandwidth, cost, and reliability

Description : Which post-installations activities are recommended by SAP after the installation of an SAP ECC 6.06 system? Note: there are 2 correct answered to this question A. Restart your SAP system ... of users involved in the implementation project D. Confirm the installation in an SAP Support ticket

Last Answer : A. Restart your SAP system and check logs for errors B. Install a valid license key

Description : The _________ should plan well and execute perfectly the implementation of ERP. A. Organisation B. System developers C. Vendors D. Top Management

Last Answer : B. System developers

Description : Which directory implementation is used in most Operating System?  (1) Single level directory structure (2) Two level directory structure (3) Tree directory structure (4) Acyclic directory structure 

Last Answer : Common computation models: Sequential program model Statements, rules for composing statements, semantics for executing them Communicating process model ... Object-oriented model For breaking complex software into simpler, well-defined pieces

Last Answer : Liquid Crystal Display:-An LCD is a low-cost, low power device capable of displaying text and images. LCD's are extremely common in embedded systems since such system often does not have video monitors ... toggles the enables bit and acts as a delay so that the command can be processed and executed.

Last Answer : A semaphore is called binary semaphore when its value is 0, it is assumed that it has been taken (or accepted) & when its value is 1, it is assumed that it has been released & no ... that are not themselves reentrant.3. A reentrant function may does not use the hardware in a nonatomic way.

Last Answer : The main characteristics of an embedded system are:1. Single functioned2. Tightly constrained3. Reactive and real time1. Single functioned:An embedded system usually executes a specific program repeatedly.Ex. Pager ... computer user. But it doesn't result in a system failure.Ex. Digital camera chip

Description : Define embedded system.

Last Answer : An embedded system is nearly any computing system other than a desktop computer. Embedded systems are hard to define because they cover such a broad range of electronic devices. It has three main components: 1. Hardware 2. Main application software 3. Real time operating system

Description : What is a hard real time system?

Last Answer : If the real-time systems have minimum interrupt latency and task deadline with prescribe time limits then it is known as hard real-time systems.  If these two requirements meet in real time systems but not always then it is known as soft real-time systems.

Description : A 1000 × 1000 bus admittance matrix for an electric power system has 8000 non-zero elements. The minimum number of branches (transmission lines and transformers) in this system are _____ (up to 2 decimal places)

Last Answer : Ans: 3500.00

Description : A 4 bus power system consists of 4 transmission lines, then find the sparsity of Y bus matrix? a) 0.75 b) 0.25 c) 0.4 d) 0.5

Last Answer : b) 0.25

Description : For n bus power system size of Y bus matrix is a) n*n b) (n-1)*(n-1) c) (n-1)*(n-2) d) (n-2)*(n-2)

Last Answer : a) n*n

Description : A high quality CAD system uses the following for printing drawing and graphs a. Dot matrix printer b. Digital plotter c. Line printer d. All of the above

Last Answer : b. Digital plotter

Description : A high quality CAD system uses the following for printing drawing and graphs a. Dot matrix printer b. Digital plotter c. Line printer d. All of the above

Last Answer : b. Digital plotter

Description : A power system is represented by its system matrix ZBUS (m × m). Now an element is added in power system network without creating a new node. The dimension of the new impedance matrix will be (a) m × m (b) (m + 1) × (m + 1) (c) (m – 1) × (m – 1) (d) (m + 2) × (m + 2)  

Description : For a 15-bus power system with 3 voltage controlled buses, the size of Jacobian matrix is

Last Answer : For a 15-bus power system with 3 voltage controlled buses, the size of Jacobian matrix is 25 x 25

Description : List the points of a simplified design process.

Last Answer : Ans. A design process may include a series of steps followed by designers. Depending on the product or service, some of these stages may be irrelevant, ignored in real-world situations in order ... the design process repeated (with corrections made) at any time before, during, or after production.

Description : List down various types of clamping devices used in design of Jigs. Explain any one with sketch.

Last Answer : List of Types of clamping devices used in design of jigs. i. Screw clamp ii. Pivoted clamp. iii. Equalizing clamp. iv. Latch clamp. v. Wedge clamp. vi. Hinged jaw clamp. ... to be gripped on its edges as shown in figure. This arrangement ensures easy machining of the work piece 

Description : Which sequence of research steps is logical in the list given below? (A) Problem formulation, Analysis, Development of Research design, Hypothesis making, Collection of data, Arriving ... sample and data collection tools Formulation of hypothesis, Collection and interpretation of research evidence

Last Answer : (C) Problem formulation, Hypothesis making, Development of a Research design, Collection of a Data; Data analysis and formulation of generalizations and conclusions. 

Description : Which opinion is not correct? (A) Education is a subject of concurrent list of VII schedule of Constitution of India (B) University Grants Commission is a statutory body (C) Patent, inventions ... D) Indian Council of Social Science Research is a statutory body related to research in social sciences

Last Answer : Answer: C State Election Commission: The power of superintendence, direction and control of all elections to the local government bodies vest with the State Election Commissions as envisaged in Article 243K ... of elections to the office of the President of India and the Vice-President of India 

Description : List basic design requirement of connecting rod.

Last Answer : In designing a connecting rod for I.C. engine, the following points should be taken into consideration : Strength to withstand the high inertia forces. Minimum mass to minimise ... undue wear. High speed reciprocation without noise. Rigid construction to withstand mechanical distortion.

Description : while(1) {while(!go);done = 0;count = 0;i = 0;while(i < 64){temp = A[i];if((temp > 47) && (temp <58)){count++;A[i] = temp - 48;}i = i + 1;}done = 1;}

Description : Who Forms The Part Of Six Sigma Implementation Team?

Last Answer : Attaining Six Sigma is a team effort. An organization who wants to attain Six Sigma needs a lot of restructuring and change in attitude. It includes building up the following roles to take up the ... Green Belts-These are like the soldiers on the war front who actually implement the planned action.

Description : The co pilot is responsible for monitoring the implementation of the commanders decision

Last Answer : False

Description : The co-pilot is responsible for monitoring the implementation of the Commander’s decision. a. True b. False

Last Answer : b. False

Description : What are all the 3 gems in JH implementation

Last Answer : (i) Activity board (ii) One-point lesson (iii) Team meetings

Description : What are some major obstacles to TQM implementation?

Last Answer : Lack of management commitment, Inability to change organizational culture, Improper planning, Lack of continuous training and education, Paying inadequate attention to internal and external customers, Inadequate ... and teamwork, Lack of employee involvement, Emphasis on short-term results, etc.

Description : What are the things you should remember in the process of RPA Implementation?

Last Answer : ∙ Define and focus on the desired ROI ∙ You should target to automate important and highly impactful processes ∙ Combine attended and unattended RPA

Description : A developer wants to process all transactions in the sequence specified by the application. Which type of Remote Function Call (RFC) implementation do you recommend? A. Background RFC (bgRFC) B. Asynchronous RFC (aRFC) C. Synchronous RFC (sRFC) D. Transactional RFC (tRFC)

Last Answer : D. Transactional RFC (tRFC)

Description : Which is not the main architectural feature of Power PC: a. It is not based on RISC b. Superscalar implementation c. Both 32 & 64 Bit d. Paged Memory management architecture

Last Answer : a. It is not based on RISC

Description : Which of the following is not phase of the Fundamental Test Process? a) Test Planning and Control b) Test implementation and Execution c) Requirement Analysis d) Evaluating Exit criteria and reporting

Last Answer : c) Requirement Analysis

Description : A project manager has been transferred to a major software development project that is in the implementation phase. The highest priority for this projectmanager should be to A. Establish a relationship with ... the manager' s management style D. Ensure that the project proceeds at its current pace

Last Answer : B. Learn the project objectives and the existing project plan

Description : Which of the following is a requirement of an effective software environment? I. Ease of use II. Capacity for incremental implementation III. Capability of evolving with the needs of a project IV. Inclusion of advanced tools A.I, II &III B.I, II &IV C.II, III&IV D.I, III&IV

Last Answer : A.I, II &III